Large size oxygen /nitrogen/argon/helium gas cylinder
1.Introduction
The Seamless Steel Gas Cylinder are all made by high quality seamless steel pipe,consistent height, smoothly painting, and excellent properties, which is widely used for steel cutting, welding, electronic, medical and other fields.and are supposed to be used repeatedly for keeping argon which is mainly used for steel cutting, welding, electronic, medical and so on.
Type |
Guida gas cylinder |
Outside diameter |
89-267mm |
Water capacity |
2-80L |
Height |
430-1815mm |
Working pressure |
150-300Bar |
With Cap Height |
490-1900mm |
Test pressure |
250-450Bar |
Weight |
3.4-80kg |
|
|
|
|
Design wall thickness |
1.9-6.0mm |
Material |
37Mn 34CrMo4 |
Storage gas |
0.3-15M3 |
|
|
Color |
Green, Black, White, Blue, Yellow, as Requested/as per your requested |
Filling medium |
Air, oxygen, argon, hydrogen, helium, nitrogen, carbon dioxide, spacial gas and mix gas |
Packing |
1.bulk loading; 2.packed in plastic woven net; 3.packed in wooden pallets; 4.as required. |
About SEFIC |
As a China gas cylinder manufacturer, GUIDA offers Oxygen Gas Cylinder, Nitrogen Gas Cylinder, Argon Gas Cylinder, CO2 Gas Cylinder, Hydrogen Gas Cylinder, Helium Gas Cylinder, Acetylene gas cylinder, CO2 Cartridge and Aluminum Cylinder … CE/TUV certified. |
2. Catalgoue - ISO/DOT/TPED certified
3.Transportaion
Our team
Q&A
1.Who are we?
We are based in Qingdao, China, started from 2014,specialized in cylinders and gases production. Mainly sells to Europe,North America,Middle East and South America market.
2. How can we guarantee quality?
-Skilled technicians & workers;
-High quality materials;
-Superior machinery from German;
-Strict Inspection before shipment;
3.What can you buy from us?
GAS CYLINDER,HIGH PRESSURE GAS CYLINDER,DISPOSABLE GAS CYLINDER,FIRE EXTINGUISHER,VALVE
4.Can you produce according to customers' design?
We can produce the goods according to customers' need.
5. What certificate do we have ?
ISO 9809, DOT and TPED approved.
6. How long is the delivery time?
7~30 days depends on the order.